Proposed 2026-2035 Capital Improvements Program

Table of Contents

CIP Cover      
2026-2035 Summary    Public Works - Operations Division 57
  CIP Summary 2026 1   Road Resurfacing Program 58
  CIP Summary 2027 2   Road Resurfacing Program - UNH 60
  CIP Summary 2028 3   Crack Seal Program 61
  CIP Summary 2029 4   Sidewalk Improvement Program 62
  CIP Summary 2030 5   Drainage System Rehabilitation Program 64
  CIP Summary 2031 6   Stormwater Management Program - Permit Compliance 65
  CIP Summary 2032 7   Facility Infrastructure Improvements 66
  CIP Summary 2033 8   Oyster River Dam Removal 67
  CIP Summary 2034 9   Madbury Roadway - Phase IV-A Edgewood to Emerson 68
  CIP Summary 2035 10   Madbury Roadway - Phase IV-B Edgewood to Route 4 70
Business Department     Madbury Roadway Phase V - Multi Use Path 71
  Municipal Software Package 11   Dump Truck Replacement (3-5 Ton) 72
Fire Department 13   Motor Vehicle Lubrication Distribution System Replacement 78
  Replace Breathing Apparatus (SCBA) & Air Management 14   Front End Loader Replacement 79
  Replace 2013 Chevy 2500 (Utility Truck) 15   Mobile Air Compressor Replacement 80
  Fire Station Improvements 16   Engineering Jeep Replacement 81
  Replace Airbags for Technical Rescue 17   Sidewalk Plow Tractor Replacement  82
  Purchase Personal Protective Equipment (PPE) 18   Pickup Truck Replacement (Dodge Ram) 83
  Replace Thermal Imaging Cameras 19   Rubber Tire Excavator Replacement (Cost share with Water Fund 25%) 84
  Replace 2007 Ford F-350 (Forestry Truck) 20   Longmarsh Road Bridge Replacement 85
  Replace 2017 Ford Explorer (Fire Prevention) 21   Roadway Sweeper Replacement 86
  Refurbish 2015 Marion Pumper 22   Pickup Truck Replacement (3/4 Ton) 87
  Replace Hydraulic Rescue Tools 23   Front End Loader Replacement 88
  Replace Portable Radios 24   Sidewalk Plow Tractor Replacement 89
  Replace 2021 Ford F-350 (Rescue 5)  25   Aerial Bucket Truck Replacement 90
  Defibrillator/Monitor Replacement  26 Public Works Sanitation Divsion 91
  Replace 2015 Ferrara Aerial Truck 27   Rolloff Truck Replacement 92
  Replace Automated CPR Device 28 Recreation Projects 93
  Refurbish 2018 Marion Pumper (Engine 2) 29   Tennis/Pickleball Courts - Woodridge Park 94
  Replace Automated External Defibrillators (AED's) 30   Pavillion & Shade Structures - Woodridge Park 95
  Replace 2013 Can-Am UTV 31 Water Fund Projects 96
  Replace 2021 GMC Yukon XL (Car 1) 32   Town Water System Improvements 97
  Replace 2015 Stealth Enclose Trailer 33   Town/UNH Shared Water System Improvements 98
  Replace 2022 GMC Yukon XL (Car2) 34   Rubber Tire Excavator Replacement (Cost share with General Fund 75%/25%) 99
  Replace 2012 Marion Tanker (Tank 4) 35   Utility Truck Replacement (One Ton) 100
  Replace Land Mobile Radio (LMR) Communications Connectivity 36 Wastewater Fund Projects 101
 Replace 2024 Polaris UTV (UTV 2) 37   Wastewater Facilities Plan 102
 Replace 2025 Chevy Tahoe (Car 3) 38   Collection System Replacement/Upgrade (Town/UNH) 103
 New Fire Station 39   Collection System Replacement/Upgrade (Town Only) 104
 Replace 2015 Marion Pumper (Engine 1) 40   WWTP Major Components Contingency  105
      Pickup Truck Replacement (One Ton) 106
GIS Projects 41 Churchill Rink Fund 108
  GIS Program 42   Replace Refrigeration System Evaporative Condenser 109
Information Technology 43 TIF Projects 110
  IT Equipment Replacement 44   Purchase of Parking Lot (Sammy's Lot) 111
Police Department 45    
  Vehicle Replacement 46    
  Sidearm (Pistol) Replacement 47    
Public Works - Buildings & Grounds 48    
  Seasonal Decorative Lighting  49    
  Dump Truck Replacement (One Ton) 50    
  Pickup Truck Replacement (1/2 Ton) 51    
  Courthouse/Old Town Hall Restoration 52    
  Purchase of Solar Panels (Gravel Pit) 53    
  Pickup Truck Replacement (3/4 Ton) 54    
  Commercial Lawnmower Replacement 55    
  Dump Truck Replacement (One Ton)  56