Approved 2018-2027 Capital Improvements Program

Table of Contents

2018-2026 Summary    Public Works Operations Division 63
  CIP Summary 2018 1   Road Resurfacing 64
  CIP Summary 2019 3   Cedar Point Road Paving 66
  CIP Summary 2020 4   Sidewalk Improvements 67
  CIP Summary 2021 5   Dump Truck Replacement 75
  CIP Summary 2022 6   Main Street/Pettee Brook Round-a-bout 76
  CIP Summary 2023 7   Oyster River Dam Repairs 77
  CIP Summary 2024 8   Dame Road Paving 78
  CIP Summary 2025 9   Mobile Air Compressor 79
  CIP Summary 2026 10   Backhoe Replacement (cost split w/Water & WW) 80
  CIP Summary 2027 11   Roadway Sweeper 81
Proposed Debt Schedules 12   1/2 Ton Pickup Replacement 82
Business Department 16   Aerial Bucket Truck 83
  Statistical Update - Assessing 17   Sidewalk Plow Tractor Replacement 84
  Municipal Software Package 18 Public Works Sanitation Division   85
Economic Development 19   Recycling Collection Vehicle Replacement 86
  Technology Drive Infrastructure        Improvement 20   Front End Loader 87
Fire Department Projects 21   Roll-off Truck 88
  Radio Simulcast Upgrades 22   Skid Steer 89
  Permitting Software Purchase 23   Refuse Collection Vehicle Replacement 90
  Deputy Chief Vehicle Replacement 24   Recycling Vehicle Replacement 91
  Medic 1 Replacement 25 Recreation Department 92
  Defibrillator Replacement 26   Vehicle Purchase 93
  Washing Extractor/Dryer Purchase 27 Water Fund 94
  New Fire Station 28   Technology Drive PRV Station 95
  Asst. Chief Vehicle Replacement 29   Madbury Road Booster Pump Station 96
  Thermal Imaging Camera 30   Town/UNH Shared Water System Improvements 97
  Utility Vehicle Replacement (Silverado) 31   Wiswall Dam Spillway 99
  Turnout Gear Replacement 32   Backhoe Replacement (cost split w/Oper. & WW) 101
  Forestry Unit Replacement 33   One Ton Utility Truck Replacement 102
  Replace & Update Microwave Link 34 Wastewater Fund 103
  Tanker Refurbishment 35   Wastewater Facilities Plan 104
  Chief Vehicle Replacement 36   WWTP Major Components Contingency 105
  Fire Prevention Vehicle Replacement 37   Collection System Repair/Upgrade (Town Only/UNH) 106
  Engine 1 Refurbishment 38   Collection System Repair/Upgrade (Town Only) 107
  SCBA Replacements 39   3/4 Ton Pickup Truck Replacement 108
  Airbags for Vehicle Extraction Replace. 40   18" Force Main Replacement 110
  Mobile Radio Upgrades - 3 Year Program 41   WWTP Phase III 111
  Rescue 1 Replacement 42   Backhoe Replacement (Cost split w/Oper. & Water) 113
Information Technology Projects 43   Commercial Lawnmower 114
  IT Equipment Replacement 44 Churchill Rink 115
  HD Studio Upgrade 45   Renovations 116
  GIS Program 46 Tax Increment Financing Districts 131
Police Department Projects   47   Stone Quarry Drive TIF - Phase III Infrastructure Improvements 118
  Vehicle Replacement 48   Downtown TIF - Structured Parking 119
  Radio Simulcast Upgrades 49   Downtown TIF - Purchase of Parking Lot (Sammys) 120
  Evidence Management Software 51    
Public Works Buildings & Grounds 52    
  Downtown Holiday Decorations 53    
  Purchase Solar Panels at Town Facilities 54    
  3/4 Ton Pickup Replacement 55    
  Purchase of Solar Panels at Gravel Pit 56    
  One Ton Dump Truck Replacement 57    
  1/2 Ton Pickup Replacement 58    
  Commercial Lawnmower 59    
Public Works Engineering Division 60    
  Littlehale Pond Culvert Replacement 61    
  Culvert & Outfalls Program 62