Section 03: Temporary Construction Permit

Municipal Code: 
Chapter 118: Solid Waste

Details

Section 3 - Temporary Construction Permit

This dated and numbered paper permit allows a contractor working for a Durham taxpayer or resident to enter the SWMF. Demolition waste that results from new building construction, additions to existing buildings, renovations, repairs, modifications, and/or maintenance of existing buildings and/or appurtenances may be dropped off. Prior purchase of a SWMF entrance permit by the taxpayer or resident is required. All materials shall be separated and unloaded in the proper areas as directed by the SWMF attendant. This permit allows for a maximum of a 1-ton truck full of demolition waste to be dumped one time.  The permit will be valid for 6 days from the date of issuance.  The taxpayer or resident, at a cost of $65.00, shall purchase this permit.  These permits will be sold at the Department of  Public Works and surrendered upon use or expiration date. Proposed implementation date is January 1, 2003.

A.  A temporary construction permit can be purchased for $65.00 at DPW.
B.  Valid for 6 days from issuance.
C.  The taxpayer or resident shall purchase the permit.
D.  Proposed implementation date January 1, 2003.
E.  Prior purchase of a SWMF entrance sticker by the taxpayer or resident is required.
F.  Materials dropped off shall be separated at the SWMF.
G.  Permits will be surrendered upon use.